Services
Supply, stress, grout, certify.
One team from anchorage specification to the grouting record. TYROS manufactures the AT post-tensioning system in India, supplies it and stresses it with its own crews and calibrated equipment.

Stressing services, on your programme.
Crews, jacks and pumps mobilised to site. Every tendon stressed in recorded increments, checked against design elongation and grouted to specification.
How we stress a tendonSite · Okha railway bridge, Gujarat
Five steps, one record per tendon.
Duct & anchorage installation
Ducts are fixed to the tendon profile on chairs, anchorage cones are set at the bulkhead with their spiral bursting reinforcement, and grout inlets and vents are placed before the pour.
Strand threading
High-tensile strands to IS 14268 are pushed or pulled through the ducts once the concrete has reached its transfer strength, then the anchor head and wedges are fitted.
Stressing to 80% UTS
Calibrated multi-strand jacks pull all strands together to the specified force, normally 80% of the tendon's ultimate tensile strength, in controlled increments.
Elongation check & lock-off
Measured elongation is compared with the design value. Within tolerance, the wedges are seated, the jack released and the strands cut and sealed.
Grouting
Ducts are filled with cement grout that bonds the strand to the concrete and gives it permanent corrosion protection. Vacuum grouting is used where IRC specifications call for it.
Send us the tendon schedule. We'll send back the anchorage.
Anchorage specifications, anti-burst reinforcement details and the stressing methodology — for every contractor, on every job.
Need the tendons stressed too? See our post-tensioning stressing services.